<?xml version="1.0" encoding="utf-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0">
  <channel>
    <atom:link href="http://www.mhandball.org/page-1748867/BlogPost/4973763/RSS" rel="self" type="application/rss+xml" />
    <title>Michigan Handball Association Palmer Park updates</title>
    <link>https://www.mhandball.org/</link>
    <description>Michigan Handball Association blog posts</description>
    <dc:creator>Michigan Handball Association</dc:creator>
    <generator>Wild Apricot - membership management software and more</generator>
    <language>en</language>
    <pubDate>Sat, 11 Apr 2026 05:21:36 GMT</pubDate>
    <lastBuildDate>Sat, 11 Apr 2026 05:21:36 GMT</lastBuildDate>
    <item>
      <pubDate>Sat, 03 Apr 2021 00:15:33 GMT</pubDate>
      <title>Power &amp; Lighting</title>
      <description>&lt;p&gt;NEWS!!!! The city is in the process of installing power outlets and lighting for the courts. Get ready for "under the lights" action!&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/10266799</link>
      <guid>https://www.mhandball.org/pp_updates/10266799</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Wed, 01 Jul 2020 12:44:13 GMT</pubDate>
      <title>New Storage Box</title>
      <description>&lt;P&gt;We installed a storage box near the grill. It’s set into the cement with bolts. It will house:&lt;BR&gt;&lt;/P&gt;

&lt;P&gt;- expendables like charcoal, lighter fluid (I don’t think it’s a safety issue, but your comments are welcome), matches.&lt;/P&gt;

&lt;P&gt;- grill tools (need donations of these)&lt;/P&gt;

&lt;P&gt;- a collapsable broom for the courts&lt;/P&gt;

&lt;P&gt;- a blower should someone decide to donate one.&lt;/P&gt;

&lt;P&gt;- whatever else will fit.&lt;/P&gt;

&lt;P&gt;The lock combination is&amp;nbsp;&lt;STRONG&gt;0619&lt;/STRONG&gt;. Right now there is one lock on the box, though it is machined for two. If I put a second one on, it will have the same combination. To me, the lock is a deterrent to theft by non-players. That said, there’s nothing stored in the box we need to overthink.&lt;/P&gt;

&lt;P&gt;We are sharing the combination with racquetball players. If it’s determined they don’t contribute to the expendables, we’ll relinquish access.&lt;/P&gt;

&lt;P&gt;_________&lt;/P&gt;

&lt;P&gt;You may noticed the court walls are getting damage repaired and will be painted. I’m scheduling work to not conflict with our normal play times M-W-F 3:00 onward, and Sunday 9:00 - 1:00.&lt;/P&gt;

&lt;P&gt;I am in contact with the City about maintenance of the floors. You may have noticed a deterioration in the front of the southeast court. I’ll keep you apprised.&lt;/P&gt;</description>
      <link>https://www.mhandball.org/pp_updates/9071631</link>
      <guid>https://www.mhandball.org/pp_updates/9071631</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Sat, 20 Jun 2020 19:48:31 GMT</pubDate>
      <title>NEW BARBECUE GRILL!</title>
      <description>&lt;p&gt;Players inaugurated the new grill on Juneteenth. About 12 players and friends potlucked brats, noodle salad, burgers and libations. Thanks to Tony DiSantis for generously contributing cost for the grill, and Dale Chimenti who summoned his Italian heritage to pour the grill's foundation. Tile set by Stewart Shevin. Come and enjoy!&lt;/p&gt;

&lt;p&gt;&lt;img src="https://mha.wildapricot.org/resources/Pictures/Website%20Images/grill.jpg" alt="" title="" border="3" width="302" height="403" style="border-color: rgb(234, 74, 93);"&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/9049644</link>
      <guid>https://www.mhandball.org/pp_updates/9049644</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Wed, 03 Jun 2020 01:41:26 GMT</pubDate>
      <title>Palmer Park news June 2, 2020</title>
      <description>&lt;P&gt;&lt;SPAN&gt;&lt;FONT color="#000000" face="Helvetica" style="font-size: 14px;"&gt;Maybe you’re cocooning or taking your chances in the wild outdoors. Hopefully restrictions on park use will be lifted soon in such a way that more peeps will find comfort on the courts. In the meantime, we are continuing with improvements at Palmer Park.&amp;nbsp;&lt;/FONT&gt;&lt;/SPAN&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT color="#000000" face="Helvetica" style="font-size: 14px;"&gt;- Your MHA funds at work…. We’ve contracted a painter to repair the walls that have had moister damage, then repaint the surface. First the south courts will be done, then the north. I will schedule so there will be as little downtime as possible. I will let folks know when painting starts.&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;SPAN&gt;&lt;FONT style="font-size: 14px;"&gt;- We should be taking delivery within the next two weeks for a barbecue grill. A Tony D. donation. It will get sunk into the ground at the southeast corner of the courts outside of the fenced area. My guess is that we will pour a 24” x 24” &amp;nbsp;pad underneath it. Anyone who is willing to help, or knows a handball player who is experienced in concrete please contact me.&lt;/FONT&gt;&lt;/SPAN&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT color="#000000" face="Helvetica" style="font-size: 14px;"&gt;- I had a thought of installing a gang box into the cement at the same time. ($260 including shipping) This would house charcoal, tools and such for the grill. It would have a lock to deter the squirrels. Check it out and let me know how you feel about this expense.&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;A href="https://www.northerntool.com/shop/tools/product_200664848_200664848"&gt;&lt;FONT style="font-size: 14px;"&gt;https://www.northerntool.com/shop/tools/product_200664848_200664848&lt;/FONT&gt;&lt;/A&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 14px;"&gt;- The city is running power to the log cabin and the storage building next to the tennis courts. I have asked the GSD to run a conduit to the handball courts as well. Surprisingly, they did not laugh at me, but are actually considering doing it! This would be a 220 / 110 line that would terminate to a simple junction box with a receptacle for now. Enough power to run small equipment. Cross your fingers.&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 14px;"&gt;- The city is also planning on installing street lights in the park come November. I don’t know specifics.&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 14px;"&gt;- I encourage you to subscribe to the Palmer Park forum on the MHA website. You will automatically get notified of news and games at the courts. If you didn’t read my email and need help with that give a shout.&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 14px;"&gt;&lt;BR&gt;&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 14px;"&gt;Ta, ta,&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 14px;"&gt;Stewart&lt;/FONT&gt;&lt;/P&gt;</description>
      <link>https://www.mhandball.org/pp_updates/9011025</link>
      <guid>https://www.mhandball.org/pp_updates/9011025</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Tue, 02 Jun 2020 22:46:09 GMT</pubDate>
      <title>BARBEQUE GRILL</title>
      <description>&lt;p&gt;Hey all, Thanks to a generous donation from Tony DeSantis, we will be installing a park-style barbecue grill at the south court area! So get ready for post game swankie-frankies, lentil burgers and other goodies. We are looking for donations. We will update you once it's ready to fire up.&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/9010731</link>
      <guid>https://www.mhandball.org/pp_updates/9010731</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Wed, 14 Aug 2019 03:19:22 GMT</pubDate>
      <title>solar lights installed</title>
      <description>&lt;p&gt;&lt;font style="font-size: 14px;" face="Ubuntu"&gt;&lt;span&gt;&lt;font color="#000000"&gt;Hi all,&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;span style="background-color: rgb(255, 255, 255);"&gt;&lt;font style="font-size: 14px;" face="Ubuntu"&gt;Solar lights installed today in North (rear) courts. These along with surveillance "cameras" should dissuade the riff-raff. Taken at 9:30 this evening. Hey, is that a deer in the bushes? Anyway, the raincoat census is ongoing. Play on! ......&lt;img src="https://mha.wildapricot.org/resources/Pictures/ne-court.jpeg" alt="" title="" border="0"&gt;&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7827140</link>
      <guid>https://www.mhandball.org/pp_updates/7827140</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Wed, 31 Jul 2019 13:49:52 GMT</pubDate>
      <title>Four Courts finished at PP.</title>
      <description>&lt;p&gt;&lt;span style="background-color: rgb(255, 255, 255);"&gt;&lt;font style="font-size: 14px;" color="#1D2129" face="system-ui, -apple-system, BlinkMacSystemFont, .SFNSText-Regular, sans-serif"&gt;Dateline July 31 Palmer Park... The south court floors have been resurfaced and 10' fencing installed. They are ready for play. This gives us four playable courts at Palmer Park. Sport benches donated, living at the rear of the courts. Go. Play. Enjoy!&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7805503</link>
      <guid>https://www.mhandball.org/pp_updates/7805503</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Sat, 06 Jul 2019 16:15:01 GMT</pubDate>
      <title>Palmer Park fencing being installed</title>
      <description>&lt;p&gt;We were pleasantly surprised when we arrived yesterday, the 6th to find a crew installing the vertical posts for the new fencing for the south courts! The 1-3/4" black vinyl-clad mesh is being installed this coming week, as it had to be special ordered. The back height is 10' and the side returns are 8'.&lt;/p&gt;

&lt;p&gt;&amp;nbsp;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7766573</link>
      <guid>https://www.mhandball.org/pp_updates/7766573</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Wed, 03 Jul 2019 17:51:57 GMT</pubDate>
      <title>Palmer Park Friday, July 5 cleanup date set</title>
      <description>&lt;p&gt;&lt;span&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Friday fun….&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Good news. I inspected the wall caps yesterday and they are in surprisingly good shape.&amp;nbsp;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- Wall caps. We will need to caulk (I have) some seams on the north courts, and apply some Drylok sealer&amp;nbsp;(I have) for good measure.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- Walls. I picked up a gallon of the current wall paint to touch up some areas near the floors. They will need to be scrubbed first.&amp;nbsp;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- We will be raising the height of the fence on the north courts by 3 feet on Friday. Bob and I will coordinate whether he has the material or it will be a purchase. It will only take 20 minutes to install. Once the south court fence is installed, we will repurpose the 7’ T posts as a second tier of fence on the north side.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;To bring on Friday if you have it on hand: putty knifes &amp;amp; scrubbing brushes to prep / clean walls, paint brushes (2” or greater), 9” roller, buckets to hold cleaning water, rags, etc.&amp;nbsp;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;I will bring a few thick nap roller covers. I have a 6’ ladder, but if someone else has one, that would be great. If anyone has a post hold digger, let me know.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;We brought a 20’ extension ladder and two 10 gallon containers of water to the courts yesterday. They are being stored in the building next to the tennis courts.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Rain is predicted on Friday afternoon. If so, we will reschedule.....&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Stewart&lt;/font&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7741597</link>
      <guid>https://www.mhandball.org/pp_updates/7741597</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Tue, 02 Jul 2019 17:48:01 GMT</pubDate>
      <title>North Courts resurfaced!</title>
      <description>&lt;p&gt;&lt;span&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Hi all,&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Yesterday we inaugurated the refurbished north courts. They played really well! This is even though there are some small divots (“pops” in concrete terms) which the city is addressing with their contractors.&amp;nbsp;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;Speaking of contractors, I was RSVP’ed last night by Jeff Klein who is our contact at the GSD of Detroit. They are talking with the floor refurbishers before they do the south courts, to make better of the north divot situation, and doing the correct wok on the south. I will post an update on that when it’s scheduled.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;&lt;img src="https://mha.wildapricot.org/resources/Pictures/GFL_workers.JPG" alt="" title="" border="0" width="499" height="374"&gt;&lt;br&gt;&lt;/font&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7741534</link>
      <guid>https://www.mhandball.org/pp_updates/7741534</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Thu, 27 Jun 2019 17:59:10 GMT</pubDate>
      <title>court resurfacing partially completed</title>
      <description>&lt;p&gt;&lt;span&gt;&lt;font style="font-size: 12px;" face="Times"&gt;Hey all,&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;Peter Werbe and I met with Farhat Chaudrey (engineer) and Jeff Klein (Deputy Chief of Landscape Architecture) at the courts yesterday. We&amp;nbsp;accessed the north court surface work done by their vendor. &amp;nbsp;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;First, the work was contracted to be done on the south courts. They mistakenly resurfaced the north (wrong) side. The good news is that the city is having the contractor fix the south courts as it was their mistake.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;We were all in agreement that although the courts look great, the vendor did not prep the cement as expected. Specifically, &amp;nbsp;grinding down and pouring a&amp;nbsp;suitable self-leveling epoxy before the application of the slip-resistant surface paint. The crack and pop filling was less that appropriate.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;The upshot is that&amp;nbsp;Jeff will meet&amp;nbsp;with vendor to discuss making better of the north courts and approaching the south courts (to make right) &amp;nbsp;in a suitable manner. He is telling them the court surfaces need to be ground down and filled properly. They will haggle over money and whatever I’m sure. Jeff will get back to me with the&amp;nbsp;results of that meeting. I will update you once I hear back.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;As soon as the south courts are resurfaced, cyclone fencing will be installed around the south courts.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;Once the fence install starts, we will&amp;nbsp;repurpose the mesh from the south to make the north court&amp;nbsp;fencing higher (total 10’). It was &amp;nbsp;suggested to install a second&amp;nbsp;shorter fence a few feet past the first to keep more balls from&amp;nbsp;heading into the woods. We can repurpose the south T-posts for that.&lt;/font&gt;&lt;span style=""&gt;&amp;nbsp;&lt;/span&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;Other notes:&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;&lt;font face="Times"&gt;We plan to clean and apply a sealant to the stepped wall caps. This will remedy&lt;/font&gt;&lt;span&gt;&lt;font face="Times"&gt;&amp;nbsp;vegetation growth on those wall tops.&amp;nbsp;&lt;/font&gt;&lt;/span&gt;&lt;font face="Times"&gt;We’ve also noticed seepage coming through and down the side of the walls at a few points. This deteriorates the walls themselves, and has caused new paint at the base to peal in a few spots.&amp;nbsp;&lt;/font&gt;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font face="Times" style="font-size: 12px;"&gt;We’ll touch up the wall paint after repairs.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;&lt;span&gt;&lt;font face="Times"&gt;Stewart&lt;/font&gt;&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7741678</link>
      <guid>https://www.mhandball.org/pp_updates/7741678</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Thu, 30 May 2019 16:23:55 GMT</pubDate>
      <title>Court resurfacing to begin!</title>
      <description>&lt;P&gt;&lt;FONT style="font-size: 12px;"&gt;The MHA was given an update today from the General Services Division (GSD) of the City of Detroit.&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 12px;"&gt;Work is scheduled to begin today for renovations of&amp;nbsp;&lt;/FONT&gt;&lt;SPAN style="font-size: 12px;"&gt;&amp;nbsp;&lt;/SPAN&gt;&lt;SPAN style="font-size: 12px;"&gt;the two south courts.&amp;nbsp;&lt;/SPAN&gt;&lt;SPAN style="font-size: 12px;"&gt;Resurfacing: This will include grinding down and crack-filling the existing surface. Then a non-skid epoxy coating with gray colorant is applied. After that, 1-1/2" red service and out lines will be painted.&lt;/SPAN&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 12px;"&gt;Installation of back and side fencing will also begin. This will be black vinyl-clad steel cyclone, 1-3/4" mesh. The&amp;nbsp;&lt;SPAN&gt;10' high&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;backstop fencing will run the 70' span. Side fencing to create a U shape will be 8' high.&lt;/SPAN&gt;&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;SPAN&gt;&lt;FONT style="font-size: 12px;"&gt;Weather-permitting, this work should take two weeks. The two north courts will remain available for play during that time.&lt;/FONT&gt;&lt;/SPAN&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 12px;" color="#0000FF"&gt;________________________________________________________________&lt;/FONT&gt;&lt;/P&gt;

&lt;P&gt;&lt;FONT style="font-size: 12px;" color="#0000FF"&gt;The GSD was renamed from the more familiar Parks &amp;amp; Recreation Department of years past. The GSD manages&amp;nbsp;&lt;SPAN&gt;construction and maintenance &amp;nbsp;which includes&lt;/SPAN&gt;&lt;SPAN&gt;&amp;nbsp;the city's parks.&lt;/SPAN&gt;&lt;/FONT&gt;&lt;BR&gt;&lt;/P&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7507716</link>
      <guid>https://www.mhandball.org/pp_updates/7507716</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Tue, 21 May 2019 13:38:01 GMT</pubDate>
      <title>Spring at the courts</title>
      <description>&lt;p&gt;&lt;font style="font-size: 12px;"&gt;Hi all,&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;"&gt;&lt;font color="#FF00FF"&gt;Courts are ready for play!&lt;/font&gt;&lt;/font&gt; &lt;font style="font-size: 11px;"&gt;Nick Morang, Peter Werbe and Stewart Shevin cleaned the courts and shored up the temporary fencing on Saturday, the 18th. There are leaves built up at the base of the fences. We'll clear those out at our next opportunity.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 11px;"&gt;We will be given a key to the storage building next to the tennis courts (&lt;span&gt;tennis courts&lt;/span&gt;&lt;span&gt;&amp;nbsp;are&lt;/span&gt;&lt;span&gt;&amp;nbsp;currently under construction). How that key will accessed is being figured out.&lt;/span&gt;&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 11px;"&gt;We have yet to hear back from the city as to when court floors and fencing will be installed on the south courts.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 11px;"&gt;I suggest bringing a broom or better yet leaf blower when you come. There are usually a few leaves resting in the courts.&lt;/font&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7353604</link>
      <guid>https://www.mhandball.org/pp_updates/7353604</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
    <item>
      <pubDate>Fri, 01 Mar 2019 20:10:33 GMT</pubDate>
      <title>Courts status spring 2019</title>
      <description>&lt;p&gt;&lt;span&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;The City of Detroit was very impressed with the money and work the MHA members and friends put into the courts last year.&lt;/font&gt;&lt;/span&gt;&lt;span&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;&amp;nbsp;&lt;/font&gt;&lt;/span&gt;&lt;em&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;As a direct result of that effort&lt;/font&gt;&lt;/em&gt;&lt;span&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;, the General Services Division (formerly Parks and Rec) has come up with funds to resurface the two south court playing areas ( 2 x 22' x 44’), and install an 8’ cyclone fence with black vinyl coating around the south courts. The city has specked a MasterSeal product for application to the court surface. They have assured me that we will be happy with the result. We are waiting to hear as to when that work will start.&lt;/font&gt;&lt;/span&gt;&lt;br&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;As that back two courts are in good shape, this will leave us with four playable courts!&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;The court resurfacing we did to court #2 last year allowed immediate play.&amp;nbsp;&lt;/font&gt;&lt;span style="font-family: Helvetica; font-size: 12px;"&gt;That work was guaranteed for 3 years.&lt;/span&gt;&lt;span style="font-family: Helvetica; font-size: 12px;"&gt;&amp;nbsp;&lt;/span&gt;&lt;span style="font-size: 12px; font-family: Helvetica;"&gt;Admittedly it proved to be less that satisfactory. Given the city’s readiness to redo that court, we will take it as an investment and lesson learned.&lt;/span&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;For 2019 we are checking into -&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- Painting the ceiling grid the same color as the walls.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- Install a door on the brick storage shed close to the courts. This could keep maintenance items and other goodies for ready access.&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- Beautification to the court area (low height shrubs and annuals)&lt;/font&gt;&lt;/p&gt;

&lt;p&gt;&lt;font style="font-size: 12px;" face="Helvetica"&gt;- Raising $$ for solar lighting (about 380 per unit). This is to allow for evening play and contribute to safety.&lt;/font&gt;&lt;/p&gt;</description>
      <link>https://www.mhandball.org/pp_updates/7312610</link>
      <guid>https://www.mhandball.org/pp_updates/7312610</guid>
      <dc:creator>Stewart Shevin</dc:creator>
    </item>
  </channel>
</rss>